Skip to content
TAONIC

18 / 19IN DEVELOPMENTLive parts and proposed parts, each tagged

Glossary

ProposedParts of this chapter are PROPOSED. Each proposed part is tagged where it appears; everything else describes what runs. Charging is off, TAON is not deployed, no TAO reserve exists and no audit has been done.

EvidenceStatus

The words used in these pages, the state words, and what changed and when.

Terms

Terms used in these pages
TermMeaning
CapabilityA kind of work a request needs, such as an answer, a search or a forecast.
RouteA provider, or a service on a Bittensor subnet, that can do one capability, reached through one adapter.
CandidateA route eligible for this request, before one is chosen.
Selected routeThe candidate TAONIC sends the request to first: connected first, then untested, then failing, then routing order.
FallbackThe next eligible route, used only if the selected one fails. Attempts are capped.
ExecutionThe provider call itself, with its measured latency and status.
ReceiptThe record TAONIC writes for a request: capability, route, provider, subnet, latency, status, cost and a record ID. TAONIC writes it; the provider does not sign it.
ProviderA service TAONIC pays as a customer. None is a partner.
SubnetA Bittensor network of miners and validators that serves one kind of work.
Eligible surplus PROPOSEDRecognised revenue after refunds, processor fees, provider costs, operating costs, a tax reserve and earlier deficits. Never below zero.
TAO reserve PROPOSEDTAO that would be bought from eligible surplus under a published rule. It does not exist, and customers would hold no claim on it.
TAON PROPOSEDThe name of a token that has been proposed and is not deployed.
Service intent PROPOSEDA machine-readable description of a routed service that a program could discover, preview and run under a spending policy.
Policy ceilingA spending limit a caller sets for a request or a period. Today only TAONIC’s own daily provider-spend ceiling exists.
Option 1, 2, 3 PROPOSEDThe three mechanisms the concept book compares: ledger-first routing (recommended now), reserve-aligned TAON (gated) and contributor credits (later).
Micro-USDOne millionth of a dollar. TAONIC books every amount as a whole number of them.

Changelog

Changelog, newest first
Date (UTC)Change
2026-10-31Documentation restructured into eighteen task-based chapters. The economic chapters now state the recommended path, product first and token later, each marked PROPOSED. The homepage, Routes, Activity and Status were rebuilt around the live routing product. Nothing financial was deployed.
2026-09-24Documentation published. Navigation is now Overview, Ask, Routes, Activity, Status and Docs. Routes shows every route’s state from the durable records. Activity separates this browser, accounts, service accounting and the economic flow. The gateway now refuses to call a paid provider when its spending guard cannot run. /api/accounting added.
2026-09-21Durable request records and the provider spending guard went live on D1. Email sign-in was proven end to end in production, then switched off. The simulated economic pages were removed from the public site.
2026-09-16Text answers went live through OpenRouter to Chutes on subnet 64.
2026-09-15The router became multi-subnet: seven capabilities across five subnets, with fallback.
2026-09-14TAONIC became an intelligence product first; the economic model became a proposal.
2026-09-12taonic.tech went live.

State words

State words appear exactly this way on Status, Routes and in these pages.

State words
TermMeaning
VERIFIEDA check or a real request proved it, and the page says when.
CONNECTEDA route that is usable now and has completed a real request.
UNVERIFIEDA route that is configured and has not completed a real request yet.
PAUSEDA route the spending guard refused until 00:00 UTC, or the operator paused.
ADAPTER READYCode that follows a provider’s documentation; not proof of anything live.
CONFIGURATION REQUIREDA credential or setting is missing, so nothing is sent.
FAILEDIts recent checks or requests failed.
UNAVAILABLENot established, or not reachable, with the reason stated.
OFFBuilt and switched off on purpose.
PROPOSEDA design no authority has approved.
DESIGNHow something would work, written down; nothing built.
IN DEVELOPMENTBeing built; not usable yet.
NOT DEPLOYEDA contract or system that does not exist.
EXTERNAL PROVIDERRun by someone else; TAONIC is a customer.
RouteOne provider doing one kind of work, reached one way.
CapabilityA kind of question: Answer, Search, Market, Check a claim, Image, Speech, Find a match.
SubnetA Bittensor network whose miners do one kind of work, identified by a number (netuid).
Micro-USDOne millionth of a dollar. Every amount in TAONIC’s records is a whole number of them.
Eligible surplusRevenue left after provider cost, refunds and fees. Zero today.
Spending guardThe daily ceiling on what TAONIC itself spends at providers.
TAONA proposed ticker. No token exists.

Every state on this page matches Status. Where they ever differ, Status is right and this page is a defect.